projects

Mining

Completed Projects

  • Allkem/Galaxy – Canadian Lithium Mine for Wave International (2022-2024)
  • Rio Tinto various small brownfields for Rockfield (2022-2024
  • CIVMEC/BHP/MCD/Aurecon/DBM Vircon – Hay Point Coal Terminal (2021-2022)
  • Rio Tinto various small brownfields for WSP (2021)
  • Detail Design of Collie River Suspension Bridge for D+A (2021)
  • Roy Hill ROM 3 Crushing Plant + 800m Plant Conveyor (2020).
  • Roy Hill 6Km Overland Conveyor, Take Up, Transfer Station (2019).
  • BHP Area C Fire & Fresh Water Supply Tank, (2018)
  • FMG Various brownfields projects (2018)
  • Roy Hill Studies, Iron Ultrafines Recovery project
  • Roy Hill Primary Crusher Maintenance Platforms (2018)
  • Riotinto Dampier Salt, (2017)
  • Waste To Energy Project (2017).
  • Iluka Resources, Piping Process Plants (2017)
  • Riotinto Paraburdoo CV04, CV05, CV08 Conveyor and Take Up Upgrade (2017).
  • Oz Minerals – Underground pumping station.
  • BHP – Jimblebar 4D Construction Simulation
  • FMG – Various small brownfields projects
  • Sepon – Piping design for new pumping system
  • Rio Tinto – Yandi 64 bypass conveyor system
  • Rio Tinto – Yandi Sustaining Project – Classification and Scrubbing, wet plant design
  • Rio Tinto – Hopedowns 4 detail design project – ROM Crushing, Surge Bin and plant Conveyors
  • Fortescue – Solomon detail design project – ROM Crushing, Secondary Crushing & Conveyors
  • Rio Tinto – Western Turner Syncline detail design project – 21Kms overland Conveyors, Transfer Stations, Surge Bins, Stackers
  • Hopedowns 4, detail design project, Pilbara, WA (July 2010 – May 2011)
  • Roy Hill +/- 15% study (April 2010 – July 2010
  • Mount Gibson Iron, Hematite rail unloading, ship loading and storage facilities, 3D detail design
  • Geraldton Port, rail unloading facility, 3D feasibility study 10%
  • HWE, West Angelas, increase rail and mine site refueling storage capacity, 3D x 3 options feasibility study 30%
  • Dampier Salt Limited, remove and replace conveyors and ship loading facility, 3D detail design
  • API – from mine site to/and including ship loading, 3D x 4 phase feasibility study 30%
  • Karara, Magnetite/Hematite dual wagon tipper, ship loading and storage facility
  • Oakjee Port and Rail 3D feasibility study 15%
  • Newmont, Ahafo Gold mine – Milling Area
  • Newmont, Akym Gold mine – Milling Area
  • BHP, H2S plant
  • Chinese Consortium, Vanadium/Iron Ore Plant – 3D feasibility study 30%
  • Fortescue Mining Group/Worley Parsons, Crushing Plant
  • Fortescue Mining Group/Worley Parsons, Screening
  • BHP, Upgrade existing Granulation to remote Control Granulation Plant, 3D detail design
  • Auscladd Group of Companies, provide 3D detail design and 3D images for tender purposes
  • WMC, Leinster, Underground crushing station, 3D detail design
  • WMC, Leinster, underground refueling and maintenance workshops, 3D detail design
  • Anaconda Super Heater, 3D detail design
  • Copper smelting expansion, 3D feasibility study